Location: Emerson Park
Size: About 0.5 acres
Status: Fully funded with $2.8 million state grant. PRC made minor changes over the last several meetings.
Next step: ‘Final’ Dog Park Design to be approved by Parks and Recreation Commission in November, 2023; once November approval made, project will go out for construction bids.
Construction start date: Completion of construction estimated for late 2024.
Proposed Amenities: Full perimeter fencing; interior fencing to create two separate areas for small dogs and large dogs; all-weather surfaces (mulch/wood chips); shading (built structures and trees); water stations; benches; tables; agility equipment.